The following topics have been or are being investigated within the framework
of EnOB, Research for Energy-Optimized Building, focal point ViBau, funded by
the German Federal Ministry of Economics and Technology. Funding totals more
than € 10 million. The list is sorted according to the start of project
duration (newest projects appear first).
Project title |
Project manager |
Duration |
Organization |
Location |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Investigation and evaluation of the thermal
and mechanical properties of vacuum insulation glass |
Hippeli |
01.06.2007-30.11.2009 |
ZAE Bayern |
97074 Würzburg |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Development and practical testing of new
machines and facilities (process engineering) |
Hentsch |
01.06.2007-30.11.2009 |
FHR Anlagenbau |
01458 Ottendorf-Okrilla |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Technological basics and mechanics of edge
sealing for vacuum insulation glass |
Graf |
01.06.2007-30.11.2009 |
Fraunhofer Gesellschaft |
80007 München |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Development, construction and operation
of an experimental device to manufacture vacuum insulation glass |
Friedl |
01.06.2007-30.11.2009 |
Grenzebach Maschinenbau |
86661 Asbach Bäumenheim |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Development and manufacture of slim, highly
insulating skylight systems |
Stempfhuber |
01.06.2007-30.11.2009 |
Roto Frank Bauelemente |
97980 Bad Mergentheim |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Entwicklung, Herstellung und Erprobung
einer Ultraschall-Technologie zur Herstellung von Vakuumisolierglas |
Trube |
01.06.2007-30.11.2009 |
Schunk Sonosystems |
35429 Wettenberg |
Joint project: Production techniques for vacuum insulation
glass (ProVIG), Sub-concept: Implementation and optimization of the
demonstration facility and proving its practical feasibility |
Machalett |
01.06.2007-30.11.2009 |
Visio-Glas
|
98617 Sulzfeld |
Energy-optimized building; ViBau: VIP-PROVE, Vacuum
insulation panels - warranty in building practice - scientific supporting
research |
Heinemann |
01.03.2007-28.02.2010 |
ZAE Bayern |
97074 Würzburg |
Energy-optimized building: Implementation of vacuum
sandwich elements in the building envelope |
Willems |
01.10.2006-31.05.2009 |
Ruhr-Universität Bochum |
44780 Bochum |
Energy-optimized building: Development of highly gas-tight
envelope systems to implement inexpensive filling materials in vacuum
insulation panels (VIPs) for building |
Caps |
01.04.2006-31.03.2009 |
va-Q-tec |
97080 Würzburg |
Joint project: Energy-optimized building: Vacuum insulation
glass (VIG) for buildings - development of VIG in non-planar execution
and in combination with safety glass |
Mikolaschek |
01.04.2005-31.10.2006 |
Visio-Glas |
98617 Sulzfeld |
Joint project: Energy-optimized building: Vacuum insulation
glass (VIG) for buildings - technical/strategic integration in fenestration
systems |
Brandner |
01.08.2004-31.10.2006 |
BBG |
87719 Mindelheim |
Joint project: Energy-optimized building: Vacuum insulation
glass (VIG) for buildings - coordination, project management and marketing |
Friedl |
01.08.2004-31.10.2006 |
Grenzebach Maschinenbau |
86661 Asbach Bäumenheim |
Energy-optimized building, sub-concept 1: Joint project:
Vacuum insulation technology in buildings: Further development of vacuum
insulation panels for permanent and universal use in building |
Behnke |
01.06.2003-30.04.2007 |
Boetker |
28241 Bremen |
Energy-optimized building, sub-concept 1: Joint project:
Vacuum insulation technology in buildings: Development of innovative
components for vacuum insulation panels and development of system applications
to improve thermal insulation for buildings as well as collector and
storage systems |
Jacobsen |
01.06.2003-31.05.2006 |
Wipak Walsrode |
29656 Bomlitz |
Energy-optimized building, sub-concept 1: Joint project:
Vacuum insulation technology in buildings: Vacuum insulation in thermal
insulation compound systems |
Grochal |
01.06.2003-31.03.2006 |
Sto
|
79778 Stühlingen |
Energy-optimized building, sub-concept 1: Joint project:
Vacuum insulation technology in buildings: Development of innovative
thermal insulation systems on the basis of high-performance vacuum insulation
panels |
Eberhardt |
01.06.2003-28.02.2006 |
Porextherm Dämmstoffe |
87437 Kempten |
Joint project: Vacuum insulation technology in buildings:
VIPs - development and optimization of innovative thermal insulation
systems on the basis of high-performance vacuum insulation panels with
long-term stability for use in buildings |
Platzer |
01.05.2003-30.04.2008 |
Fraunhofer Gesellschaft |
80007 München |
Energy-optimized building, sub-concept 1: Thematic
network vacuum insulation technology in buildings: Development of prefabricated,
vacuum-insulated, passive-house-standard compound elements and their
application in a prototype |
Stölzel |
01.05.2003-30.04.2007 |
Variotec Sandwichelemente |
92318 Neumarkt i.d. Opf. |
Energy-optimized building, sub-concept 1: Organization
of a coordination centre for the national activities within the International
Energy Agency (IEA) ECBS-Annex 39 High Performance Thermal Insulations
for Buildings (HiPTI) and quality control for vacuum insulation panels |
Heinemann |
01.03.2003-31.01.2007 |
ZAE Bayern |
97074 Würzburg |
Joint project: Vacuum insulation technology in buildings:
Development of prefabricated, vacuum-insulated concrete elements (VIPBON) |
Hangleiter |
01.10.2002-31.05.2004 |
Albert Hangleiter |
88212 Ravensburg |
Joint project: Vacuum insulation technology in buildings:
Development of a highly insulating brick using vacuum insulation panels |
Rimmele |
01.07.2002-31.07.2008 |
Georg Rimmele
|
89573 Ehingen |
Joint project: Vacuum insulation technology in buildings:
Development of vacuum-insulated panels as an insulating element in bricks |
Woschko |
01.07.2002-31.07.2008 |
Woschko Winlite |
74189 Weinsberg |